project 1
INDUSTRIALIZED BUILDING SYSTEM
In this group project which predominantly relate to the topic of Industrialised Building System (IBS). Before embarking on this project, we are exposed to different types and methods of the IBS system and the calculation of IBS scoring in the classroom. Firstly, each group are required to design a 3-storey apartment block using mainly IBS components.
final outcomes
learning outcome
From this project, I have learned the way to apply appropriate IBS construction method in the design of building and IBS construction process.
​
Taylor's graduate capabilities
![Logo-Taylors-University-200.png](https://static.wixstatic.com/media/8b1632_879f024f6a524702bf6b38c4d2edcfde~mv2.png/v1/fill/w_160,h_160,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/Logo-Taylors-University-200.png)
![6579076_orig.png](https://static.wixstatic.com/media/8b1632_48af29e149044375a081084a7a490105~mv2.png/v1/crop/x_0,y_310,w_610,h_290/fill/w_459,h_218,al_c,q_85,usm_0.66_1.00_0.01,enc_avif,quality_auto/6579076_orig.png)
bottom of page